Skip to main content

4D real-time geotechnical hazard assessment and reporting

Ultra-deep mining under high stress carries severe rockbursting and other geotechnical risk, endangering personnel, equipment, and production. Mitigation of geotechnical risk requires rapid assessment of hazards as they are evolving and practical decision support tools for their management.

We have been awarded a major R&D project from the Ultra Deep Mining Network (UDMN) called “4D Real-Time Geotechnical Hazard Assessment and Reporting”. We will develop a system that builds directly upon a number of recent advances in data management, modelling, and risk computation – the three key technologies that must come together in a single system for real-time geotechnical hazard assessment.

Valérie Laflèche and John McGaughey at the kick-off of the project with Douglas Morrison - President and CEO, CEMI and Damien Duff - Vice President, Geoscience and Geotechnical R&D, CEMI. Managed through CEMI, UDMN aims to become the leading expert in Ultra Deep research and innovation.

The problem of geotechnical hazard assessment is amenable to risk identification methods developed recently in the field of “predictive analytics”, currently one of the most research-intensive areas in computational science. Through the UDMN project we will bring the power of predictive analytics to geotechnical hazard assessment.

We will also develop the capability of maintaining continuously updated “living” rock mass and mine models. Hazard assessments will be automatically updated as the underlying model of the mine evolves, providing real-time calibration and hazard estimation. The continuously updated mine and hazard models, and their underlying primary data, will be managed by Geoscience INTEGRATOR, our 4D geoscientific data management system.

A project deliverable is an operational real-time hazard monitoring and reporting system at Glencore’s Nickel Rim South Mine in Sudbury, Ontario.

This will form an important part of our commercial offering of geotechnical hazard assessment solutions starting mid-2016.

John McGaughey – President

John is the founder and President of Mira Geoscience. He has extensive mining industry experience focusing on quantitative, multi-disciplinary 3D and 4D interpretation for mineral exploration and geotechnical decision support. He currently leads our technology strategy and our geotechnical business. Prior to founding Mira Geoscience in 1999, he spent 10 years at the Noranda Technology Centre as a Senior Scientist in their rock mechanics group. He obtained an MSc in geological engineering and a PhD in geophysics from Queen’s University. John is based in Montreal.

Latest news

Case studies
September, 01 2019

Machine learning in mineral exploration

We have applied machine learning as part of custom solutions to complex exploration and geotechnical problems since 2015...
Read more
April, 21 2022

Extending workflows with rapid model generation – Virtual Lecture

Past event - Shaun O'Connor showed how to use the built-in scripting tools for exploratory geological modelling with sparse data...
Read more
Q&As
July, 27 2023

Q&A with VR Resources

Join us in this exciting conversation with Michael Gunning on how to find success in blue-sky exploration through integrated interpretation of magnetic data and structural geology
Read more
Software releases
September, 16 2026

New release – Geoscience INTEGRATOR 3.9

This version includes new functionality to provide a better user experience, such as: user notifications, new display options, and more!
Read more
September, 14 2020

Managing import templates

In Geoscience INTEGRATOR it is possible to edit Import template names and no-data values, activate/deactivate templates, see...
Read more
Software releases
October, 14 2025

New release – Geoscience INTEGRATOR 4.2

Geoscience INTEGRATOR 4.2 unveils a range of new features and improvements designed to boost performance and enhance user experience.
Read more
How-to videos
January, 24 2022

Creating 3D geological starting model from geological maps and structural measurements

In this lecture, Philippe generates a 3D geological model from a map with structural measurements in Geoscience ANALYST...
Read more
Developer’s sandbox
September, 13 2013

R&D projects in data management

Over the past couple of years we have been developing skills and technology in practical, business-focused data management as a solid foundation for modelling, analysis, and interpretation.
Read more
August, 25 2022

Project locks

In GOCAD Mining Suite, lock files manage the reading and writing of SKUA-GOCAD projects. They are automatically created...
Read more
January, 11 2021

Upload global descriptions

In Geoscience INTEGRATOR, add an editable global description during import to save time and reduce errors...
Read more
June, 15 2020

Arbitrary sections

In Geoscience ANALYST visualize your block model in any direction with the new arbitrary section
Read more

Please contact our team for additional information about our products and services